BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CalDiscovery//caldiscovery//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
DESCRIPTION:Santa Fe: civic\, today (Thu Sep 17\, America/Denver). Rolling
 : the window moves forward every day\, so subscribe rather than download. 
 Discovered and maintained by CalDiscovery (https://caldiscovery.com). Even
 t details belong to their publishers. Contains information from CalDiscove
 ry\, which is made available under the ODbL 1.0.
SOURCE:https://caldiscovery.com/santa-fe-nm/today-civic.ics
X-PUBLISHED-TTL:PT12H
REFRESH-INTERVAL;VALUE=DURATION:PT12H
X-WR-CALDESC:Santa Fe: civic\, today (Thu Sep 17\, America/Denver). Rollin
 g: the window moves forward every day\, so subscribe rather than download.
  Discovered and maintained by CalDiscovery (https://caldiscovery.com). Eve
 nt details belong to their publishers. Contains information from CalDiscov
 ery\, which is made available under the ODbL 1.0.
X-WR-CALNAME:Santa Fe · civic · today · CalDiscovery
BEGIN:VEVENT
SUMMARY:Online Open House for I-40 Road and Art Panel Improvements in Gall
 up  - CN 6100931
DTSTART:20260917T140000Z
DTEND:20260917T230000Z
DTSTAMP:20260918T002712Z
UID:10000441-1789632000-1792342800@www.dot.nm.gov
CATEGORIES:civic
DESCRIPTION:Online Open House on I-40 Road and Art Panel Improvements in 
 Gallup\nProject OverviewThe New Mexico Department of Transportation\, in 
 partnership with the Federal Highway Administration\, is planning improvem
 ents to I-40 within a four-mile stretch between mileposts 17.92 and 22.12
 \, within the urban area of Gallup\, New Mexico. The goal is to enhance sa
 fety and operations and bring the corridor up to current design standards.
   \n			\n			\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n
 				\n				\n				\n				\n				\n				Project AreaThe project area extends alo
 ng Interstate 40 through Gallup from just east of the Puerco River near th
 e Miyamura Interchange. This section of I-40 serves as a critical transpor
 tation route for residents\, businesses\, visitors\, and freight movement 
 through western New Mexico. Several restaurants\, hotels\, retail business
 es\, and transportation facilities are located within and near the projec
 t corridor\, including a nearby BNSF Railway yard near the US 491 intercha
 nge.   \nExisting Conditions  I-40 currently has two travel lanes in e
 ach direction. Each travel lane is 12 feet wide.  Additionally\, the ins
 ide shoulders are about 4 feet wide and outside shoulders are about 10 f
 eet wide. Between the directions of travel there’s an earthen median t
 hat varies from 28 to 52 feet wide.  \nPavement in this area is deteriora
 ting with visible cracking and rutting. The existing narrow shoulders a
 nd deteriorating art panels within the slope paving have sustained damage
  over time\, and roadside safety features no longer meet current standa
 rds. Together\, these conditions create operational and safety concerns an
 d highlight the need for improvements along this section of I-40.  \n  \
 n  \n			\n				\n				\n				\n				\n				Potential Traffic Impacts During 
 Construction  \nWhen construction begins\, work crews may need to requir
 e temporary traffic control measures to safely accommodate construction ac
 tivities while maintaining mobility through the corridor.   \nMotorist
 s should expect minor delays as work progresses from west to east along th
 e project limits.   \nPeriodic lane restrictions will be necessary\, a
 nd nighttime paving operations will require reducing I-40 to a single lane
  in certain areas.   \nMaloney Avenue will be reduced to one lane during
  artwork rehabilitation activities.   \nSafety remains the highest pri
 ority throughout construction\, and drivers are encouraged to remain alert
 \, follow posted traffic control devices\, reduce speeds in work zones an
 d use caution when traveling through active construction areas to protect 
 both workers and fellow motorists.  \nNext Steps  \nThe project is curre
 ntly in final design\, with plans to start accepting bids from contractor
 s in mid-2027. Construction is expected to begin in late 2027.  \n  
 \n			\n				\n				\n				\n				\n				How to Participate\nNMDOT is holding an
  Online Open House from September 17th to October 18th\, 2026. We invite y
 ou to review the Project Presentation and share your questions and feedbac
 k via the comment form below. \nOnline Presentation Available HERE  \nIf
  you have concerns or questions\, share them with our team by October 18th
 . Comments can be shared online (below)\, by phone\, mail\, or email. \nMA
 IL: I-40 Road and Art Panel Improvements in Gallup​c/o HDR​2155 Louisi
 ana Blvd NE\, Suite 3000​Albuquerque\, NM 87110​ \nEMAIL: connect@i40g
 allupproject.com \nPHONE: 505.404.3197​​ \n			\n			\n				\n				\n				\
 n				\n				\n				\n				\n				\n				\n				\n			\n				\n				\n				\n				\n		
 		Proposed ImprovementsThe project includes rebuilding and repairing secti
 ons of the roadway\, upgrading drainage structures\, and replacing roadsid
 e barriers. \nBetween mileposts 17.92 to 21.18 and 21.84 to 22.12\, im
 provements include: \n\nReconstructing the roadway pavement. \nWidening
  interior shoulders to 12 ft wide. \nReplacing guardrail and concrete b
 arriers to meet current standards.\n\nBetween mileposts 21.18 to 21.84\, 
 improvements include:  \n\nRehabilitating the pavement.\nRehabilitating 
 the interior 4-ft shoulders.\nReplacing guardrail and concrete barriers
  to meet current standards.\nRepairing failing concrete slope paving. \
 nReplacing existing art panels within the slope paving with new ones that 
 match the originals\n\n			\n				\n				\n				\n				\n				\n					\n					\n		
 				I-40 Gallup Reconstruction Presentation\n						Click here to view the 
 presentation on the I-40 Gallup Reconstruction Project \n  \n					\n				\
 n			\n			\n				\n				\n				\n				\n			\n				\n				\n				\n				\n				\n				
 \n				\n				\n				\n				\n				\n\n                \n                      
   \n                            Comment Form - I-40 Gallup Reconstruction 
 Project CN 6100931\n                            Complete the form below to
  provide input to the project team! \n                        \n          
               X/TwitterThis field is for validation purposes and should be
  left unchanged.First Name(Required)Last Name(Required)Email AddressMailin
 g AddressPlease share your comments and questions.CAPTCHA\n         Submit
LAST-MODIFIED:20260918T002712Z
URL:https://www.dot.nm.gov/event/i-40-reconstruction-in-gallup-online-open
 -house-cn6100931/?utm_source=caldiscovery&utm_medium=ics&utm_campaign=sant
 a-fe-nm
X-SOURCE-NAME:NMDOT
X-SOURCE-URL:https://www.dot.nm.gov/event/santa-fe-nm-car-seat-event-april
 -8-2026
END:VEVENT
END:VCALENDAR
